Increase property value
Reduce energy costs
Speak with an expert now:
01942 926456
Black solar panels on a red-brick house, fitted by TJS Solar

Solar Panels & Battery Storage in Wigan

TJS Solar is a Wigan-borough installer. From our Leigh office we design and fit solar panels and Sigenergy batteries for homes in Wigan, Aspull, Abram, Hindley Green and Ashton-in-Makerfield.

7+
Wigan-postcode installs, 2026
WN2 Β· WN4 Β· WN5
Wigan districts we fitted in
17.28 kWp
Largest: Aspull, 36 panels
18.08 kWh
Sigenergy battery on a WN2 job

Same Borough

A Wigan-borough solar company, based in Leigh

Leigh is one of the towns that make up the Metropolitan Borough of Wigan, and it is where TJS Solar is based: Office 3, Unit 4, 16 Brown Street North, WN7 1BU. Ask us about solar for a Wigan home and you are dealing with a firm from your own borough.

One team takes your job from start to finish. We survey the roof, design the system, fit the panels and wire in the inverter and battery, and we arrange the scaffolding for you.

No two roofs are alike, so each layout is planned from the survey: where the panels go, how many fit, and where the inverter and battery sit. For background, read our guide to solar in Greater Manchester.

Featured Job: WN2

11 LONGi panels with an 18.08 kWh Sigenergy battery

Finished in 2026 in the WN2 postcode area, this system pairs a 5.22 kWp array of 11 LONGi panels with 18.08 kWh of Sigenergy battery storage.

That is a lot of storage for an 11-panel roof. It can hold more than this array produces on an average day, so it can also be topped up from the grid at off-peak rates and used later.

Sigenergy is the only battery and inverter brand we fit, and TJS Solar is a Sigenergy Gold Installer.

Sigenergy Gold Installer badge

TJS Solar holds Sigenergy Gold Installer status.

Our Wigan Work

At least 7 installs in Wigan postcodes in 2026

Our job records list at least 7 completed installs in 2026 in the WN2, WN4 and WN5 postcode districts. Six have a recorded system size:

Aspull, WN2: 17.28 kWp
36 panels, our biggest job in these districts this year.
Wigan, WN5: 10.45 kWp
22 panels.
WN5: 9.60 kWp
20 panels.
WN2: 5.22 kWp + 18.08 kWh
11 LONGi panels and a Sigenergy battery (featured above).
Abram, WN2: 4.50 kWp
10 panels.
Ashton-in-Makerfield, WN4: 4.09 kWp
9 panels.

Postcode districts and area names only, never addresses. Figures are from our own job records for January to September 2026. The seventh job, in Hindley Green (WN2), is counted but not shown as a card. Leigh (WN7) jobs are on our Leigh page and are not part of this count.

Finished Roofs

How a TJS install looks from above

These drone shots come from TJS Solar jobs and show the all-black finish we fit as standard.

All-black solar panels on the roof of a red-brick semi-detached house, fitted by TJS Solar

Black panels on a red-brick semi, fitted by TJS Solar.

Solar panels covering a tiled roof slope on a detached home, fitted by TJS Solar

A full roof slope of panels, fitted by TJS Solar.

Planning And The Grid

The paperwork, handled for Wigan homes

Before they commit, most people ask two things: is planning permission needed, and does the electricity network have to agree? This is how it works for a typical Wigan house.

  1. Planning. Roof panels on a house are usually permitted development, so most homes need no application. Listed buildings and some conservation-area roofs are the exceptions, and we check at survey.
  2. The grid. Wigan is on the SP Electricity North West network. Smaller systems are notified after fitting, larger ones are approved first, and we send the forms.
  3. Handover. Once it is fitted and tested, you get your certificates and paperwork, and we walk you through how the system works.

Kit For Wigan Homes

Panels, Sigenergy storage and add-ons

β˜€οΈ

Aiko and LONGi panels

Tier 1 all-black panels, sized to your roof and your electricity use.

πŸ”‹

Sigenergy batteries

Storage from the only battery brand we fit, as a Sigenergy Gold Installer.

🏠

Larger arrays

Plenty of roof? Our Aspull job has 36 panels.

πŸ”Œ

Add a battery later

Got solar already? We can fit Sigenergy storage to your existing system.

30 years
Panel warranty as standard
10 years
Workmanship warranty as standard

Wigan households are charged under the same Ofgem cap as the rest of Great Britain. Ofgem's price cap for 1 October to 31 December 2026 is an average of 26.32p per kWh for electricity, plus a 54.83p daily standing charge (Direct Debit, average for England, Scotland and Wales). Source: Ofgem.

Solar panels and batteries for homes have 0% VAT until 31 March 2027, then 5% from 1 April 2027. Our VAT guide.

Google Reviews

What TJS customers say

β˜…β˜…β˜…β˜…β˜…

β€œI'm very impressed with the service provided by TJS Solar. Tony was transparent and never pushy, giving me honest information about costs, savings, and timelines. The whole process was quick and completely stress-free β€” it took just one month from the initial survey to having a full solar system installed. The customer service, workmanship, and professionalism of the team exceeded my expectations.”

Paul A.
Google Review
β˜…β˜…β˜…β˜…β˜…

β€œThe TJS team stepped up and worked like Trojans in some horrific weather conditions. The install looks excellent, works well and batteries filling up nicely. The paperwork is reassuringly comprehensive. Very happy at this stage.”

David P.
Google Review

Wigan FAQs

What Wigan households ask us

Are you a Wigan company?

Yes. Our office is in Leigh, one of the towns in the Metropolitan Borough of Wigan, at Office 3, Unit 4, 16 Brown Street North, WN7 1BU.

Have you fitted solar panels in Wigan?

Yes. Our records show at least 7 completed installs in 2026 in the WN2, WN4 and WN5 postcode districts, including jobs in Aspull, Abram, Hindley Green and Ashton-in-Makerfield.

Do I need planning permission for solar panels in Wigan?

Usually not. Panels on the pitched roof of a house in England are normally permitted development, as long as they stick out no more than 20 cm from the roof slope and sit no higher than the top of the roof. Listed homes need listed building consent, and flat-roof systems in a conservation area need prior approval. Wigan Council is the planning authority, and we check all of this at survey.

Who is the electricity network operator in Wigan?

SP Electricity North West, which was called Electricity North West until August 2025. We deal with them for you: smaller systems are notified after fitting, and larger ones need their approval before we install.

Can a small roof still have a big battery?

Yes. Our WN2 job pairs 11 LONGi panels (5.22 kWp) with an 18.08 kWh Sigenergy battery. We size the battery around how your household uses electricity, not only around the roof.

What warranties come with a Wigan install?

Your panels carry a 30-year warranty, and our workmanship is covered for 10 years.

Thinking about solar for your Wigan home?

Free, no-obligation survey anywhere in Wigan borough.

Get My Wigan Quote β†’

Or call us on 01942 926456